Sunday, July 8, 2012

bathroom project: part 3


The bathroom project has been 99% finished for some time, only lacking a few small details to be complete.  The trim has been installed, hardware mounted, accessories attached, switch plates switched, and everything painted!  It took me so long to make a post, because I thought for sure I would have wrapped it up by now.  Lesson learned, a remodel project (no matter how small) can really wear you down!  The doorknobs are the last piece to the puzzle, but that has obviously not kept us from enjoying our bathroom.  We are so very happy with it and glad that this was our first true stamp on the house to make it ours.  I will be taking a break until undertaking another detailed project, hahah.  Until then, enjoy the pictures!







Sink: Kohler “Verticyl”
Faucet: Kohler “Purist”
Bathroom Accessories: Kohler “Purist”
Ring Holder: CB2 "Tree Ring Holder"
Cabinetry Hardware: Restoration Hardware “Spritz”
Countertop/Backsplash: Absolute Honed Black Granite
Tub Controls: Kohler “Purist”
Tub Tile: Dal-Tile “3”x6” Subway” (Matte Artic White)
Shower Curtain: CB2
Bathroom Paint: Sherwin-Williams “Serious Grey” (6256)
Mirror Paint: Sherwin-Williams “Brittlebrush” (6684)
Door/Base Trim: 1”x4” Square Edge Poplar

4 comments:

Sunday Loft said...

Amazing! Your hard work, patience and talent is proven in the results!

Amy in Austin said...

Looks great. But the real question is- Is the storage closet functional?!

Blake said...

Amy, we do not even have enough stuff to put in the closet! There is so much storage space in the cabinet, that we hardly need to use the closet.

Jaime said...

It looks so great!!